Your shopping cart is empty!
American Association of State and Highway Transportation Officials, 2013
Publisher: AASHTO
File Format: PDF
$39.00$78.00
Pages:8
File Size:1 file , 1.9 MB
Note:This product is unavailable in Ukraine, Russia, Belarus
This specification covers compost produced from various organic by-products for use as filter berm media for erosion/sediment control. The technique described in this specification is primarily used for temporary erosion/sediment control applications where perimeter controls are required or necessary.
This technique is appropriate for slopes up to a 2:1 grade (horizontal distance:vertical distance) and on level surfaces and should be used only in areas that have sheet flow drainage patterns (not areas that receive concentrated flows).
The filter sock technology is appropriate for areas outlined in Section 1.2 as well as areas of high sheet flow erosion, around inlets, and in other disturbed areas of construction sites requiring sediment control. Unlike filter berms, the filter sock technology may be used in areas that have concentrated flow drainage patterns, up to 10 gal per minute per linear foot of filter sock.
This standard was formerly designated as provisional standard MP 9.
Standard Practice for Compost for Erosion/Sediment Control (Filter Berms and Filter Socks)
$39.00 $78.00
Standard Practice for Superpave Volumetric Design for Hot Mix Asphalt (HMA)
$34.00 $69.00
Standard Method of Test for Bulk Specific Gravity (Gmb) of Compacted Hot Mix Asphalt (HMA) Using Saturated Surface-Dry Specimens
$25.00 $50.00
A Policy on Geometric Design of Highways and Streets, PE Exam Edition
$135.00 $270.00
Standard Method of Test for Early Stiffening of Hydraulic Cement (Mortar Method) (ASTM Designation: C359-08)
$18.00 $37.00