• AASHTO T 180-21

AASHTO T 180-21

Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-lb) Rammer and a 457-mm (18-in.) Drop

American Association of State and Highway Transportation Officials, 2021

Publisher: AASHTO

File Format: PDF

$48.00$96.00


Pages:15

File Size:1 file , 2 MB

Note:This product is unavailable in Ukraine, Russia, Belarus

This method of test is intended for determining the relationship between the moisture content and density of soils when compacted in a given mold of a given size with a 4.54-kg (10-lb) rammer dropped from a height of 457 mm (18 in.). Four alternate procedures are provided as follows:

  • Method A—A 101.60-mm (4-in.) mold: Soil material passing a 4.75-mm (No. 4) sieve;
  • Method B—A 152.40-mm (6-in.) mold: Soil material passing a 4.75-mm (No. 4) sieve;
  • Method C—A 101.60-mm (4-in.) mold: Soil material passing a 19.0-mm (0.75-in.) sieve; or
  • Method D—A 152.40-mm (6-in.) mold: Soil material passing a 19.0-mm (0.75-in.) sieve.

The method to be used should be indicated in the specifications for the material being tested. If no method is specified, the provisions of Method A shall govern.

This test method applies to soil mixtures that have 40 percent or less retained on the 4.75-mm (No. 4) sieve, when Method A or B is used and 30 percent or less retained on the 19.0-mm (0.75-in.) sieve, when Method C or D is used. Material retained on these sieves shall be defined as oversize particles (coarse particles).

If the test specimen contains oversized particles, dry density and moisture corrections must be made in accordance with Annex A1. The person or agency specifying this method may specify a minimum percentage of oversized particles above which a correction must be applied. If no minimum percentage is specified, correction for the oversized particles shall be applied to material containing more than 5 percent by weight of oversized particles.

If the specified oversized particle maximum percentage is exceeded, other methods of compaction control must be used.

Note—One method for the design and control of the compaction of such soils is to use a test fill to determine the required degree of compaction and a method to obtain that compaction. Then use a method specification to control the compaction by specifying the type and size of compaction equipment, the lift thickness, and the number of passes.

More AASHTO standard pdf

AASHTO TP 118-15

AASHTO TP 118-15

Standard Method of Test for Characterization of the Air-Void System of Freshly Mixed Concrete by the Sequential Pressure Method

$34.00 $68.00

AASHTO R 35-14

AASHTO R 35-14

Standard Practice for Superpave Volumetric Design for Asphalt Mixtures

$38.00 $76.00

AASHTO TP 117-15 (2021)

AASHTO TP 117-15 (2021)

Standard Method of Test for Determination of the Voids of Dry Compacted Filler

$39.00 $78.00

AASHTO TP 116-15 (2019)

AASHTO TP 116-15 (2019)

Standard Method of Test for Rutting Resistance of Asphalt Mixtures Using Incremental Repeated Load Permanent Deformation (iRLPD)

$39.00 $78.00