• ACI 304R-00 (R2009)

ACI 304R-00 (R2009)

Guide for Measuring, Mixing, Transporting and Placing Concrete

American Concrete Institute, 01/01/2000

Publisher: ACI

File Format: PDF

$52.00$104.50


Published:01/01/2000

Pages:41

File Size:1 file , 850 KB

Note:This product is unavailable in Russia, Ukraine, Belarus

This guide presents information on handling, measuring, and batching of all materials used in making normal weight, lightweight, and heavyweight concrete. It covers both weight and volumetric measuring; central mixture plants and truck mixers; and concrete placement using buckets, buggies, pumps, and conveyors. Also covered are underwater placement and preplaced aggregate concretes. Achieving quality control in completed structures is also addressed. This Guide was Reapproved by ACI in 2009.

ACI 304R-00 (R2009) history

ACI 304R-00 (R2009)

ACI 304R-00 (R2009)

Guide for Measuring, Mixing, Transporting and Placing Concrete

$52.00 $104.50

More ACI standard pdf

ACI 232.2R-03

ACI 232.2R-03

Use of Fly Ash in Concrete

$30.00 $60.50

ACI 503.4-92(03)

ACI 503.4-92(03)

Standard Specifications for Repairing Concrete with Epoxy Mortars (Reapproved 2003)

$17.00 $34.50

Deflection Control for The Future