• ACI PRC-364.8-22

ACI PRC-364.8-22

Hydrodemolition for Concrete Removal in Unbonded Post-Tensioned Systems-TechNote

American Concrete Institute, 08/01/2022

Publisher: ACI

File Format: PDF

$9.00$19.00


Published:01/08/2022

Pages:3

File Size:1 file , 1.3 MB

Note:This product is unavailable in Russia, Ukraine, Belarus

Should hydrodemolition be used to remove concrete in structural elements with unbonded post-tensioned systems?

ACI PRC-364.8-22 history

ACI PRC-364.8-22

ACI PRC-364.8-22

Hydrodemolition for Concrete Removal in Unbonded Post-Tensioned Systems-TechNote

$9.00 $19.00

More ACI standard pdf

ACI 308.1-98

ACI 308.1-98

Standard Specification for Curing Concrete

$12.00 $25.50

ACI 228.2R-98

ACI 228.2R-98

Nondestructive TestbMethods for Evaluation of Concrete Structures

$29.00 $59.50

ACI SP-202-01

ACI SP-202-01

Third Canmet/ACI International Symposium: Sustainable Development of Cement and Concrete

$36.00 $73.50