• API Bull 2TD

API Bull 2TD

Guidelines for Tie-downs on Offshore Production Facilities for Hurricane Season

American Petroleum Institute, 06/01/2006

Publisher: API

File Format: PDF

$142.00$285.68


Published:01/06/2006

Pages:3

File Size:1 file , 520 KB

Note:This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran

Addresses the need to evaluate the tie-downs in use on offshore production facilities for drilling rigs, permanent equipment, and facilities such as quarters, helidecks, etc. The information contained in this document is presented as recomendations to improve tie-down performance during hurricanes. Bulletin 2TD also addresses situations where failure of a drilling or workover rig would result in significant damage to the platform or adjacent infrastructure.

More API standard pdf

API 6FB Errata / Supplement

API 6FB Errata / Supplement

Errata / Supplement for Fire Test for End Connections

$143.00 $286.97

API Spec 1596

API Spec 1596

Design and Construction of Aviation Fuel Filter Vessels

$117.00 $234.37

API Spec 13A

API Spec 13A

Specification for Drilling-Fluid Materials, Seventeenth Edition, Includes Errata (2008)

$72.00 $144.00

API Publ 4736

API Publ 4736

Identification of Key Assumptions and Models for the Development of Total Maximum Daily Loads

$83.00 $166.00