API Bull E3

Wellbore Plugging and Abandonment Practices, Second Edition

American Petroleum Institute, 04/01/2018

Publisher: API

File Format: PDF

$79.00$159.00


Published:01/04/2018

Pages:22

File Size:1 file , 4.8 MB

Note:This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran

This publication addresses the environmental concerns related to well abandonment and inactive well practices.

The primary environmental concerns are protection of usable aquifers from fluid migration; and isolation of hydrocarbon production and water injection intervals.

Additional issues in the document include protection of surface soils and surface waters, future and use, and permanent documentation of plugged and abandoned wellbore locations and conditions.

API Bull E3 history

API Bull E3

API Bull E3

Wellbore Plugging and Abandonment Practices, Second Edition

$79.00 $159.00

More API standard pdf

API 343

API 343

Fugitive Emissions from Equipment Leaks II: Calculation Procedures for Petroleum Industry Facilities

$31.00 $63.00

API Spec 5LC (R2006)

API Spec 5LC (R2006)

Specification for CRA Line Pipe

$70.00 $140.00

API TR 090

API TR 090

Impacts of Market-Based Greenhouse Gas Emission Reduction Policies on U.S. Manufacturing Competitiveness

$72.00 $144.00

API MPMS Chapter 19.3 Part C (R2023)

API MPMS Chapter 19.3 Part C (R2023)

Weight Loss Test Method for the Measurement of Rim-Seal Loss Factors for Internal Floating-Roof Tanks

$68.00 $137.00