Your shopping cart is empty!
American Petroleum Institute, 11/01/2006
Publisher: API
File Format: PDF
$42.00$84.00
Published:01/11/2006
Pages:41
File Size:1 file , 410 KB
Note:This product is unavailable in Russia, Cuba, Syria, North Korea, Belarus, Iran
The second part of this manual will discuss permitting discharges to impaired waters during the interim period before TMDLs are developed. The manual will describe the development of water quality-based effluent limitations on impaired waters, and will also discuss a number of issues for affected facilities to consider during the permitting process, including timing (when the permit should be issued), watershed permitting, verifying the impairment determination before the permit is issued, other controls available to bring the water into attainment, reasonable potential calculations, voluntary reduction measures, non-numeric effluent limitations, and calculating numeric effluent limitations.
Interim Permitting Manual - Navigating NPDES Permit Issues on Impaired Waters
$42.00 $84.00
Recommended Practice for Railroad Transportation of Line Pipe
$135.00 $270.73
Brushless Synchronous Machines - 500 kVA and Larger
$125.00 $250.76
Quantified Hazards Evaluation of Marine Vapor Recovery Systems
$149.00 $299.20
Management of Process Hazards (with errata February 1990)
$70.00 $140.00