Your shopping cart is empty!
PDF Preview
American Petroleum Institute, 08/01/2004
Publisher: API
File Format: PDF
$42.00$85.00
Published:01/08/2004
Pages:24
File Size:1 file , 910 KB
Note:This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran
Provides calculations for determining centralizer spacing, based on centralizer performance and desired standoff, in deviated and dogleg holes in wells for the petroleum and natural gas industries. It also provides a procedure for testing stop collars and reporting test results. This edition of API RP 10D-2 is the identical national adoption of ISO 10427-2, Petroleum and natural gas industries-Equipment for well cementing-Part 2: Centralizer placement and stop-collar testing
Recommended Practice for Centralizer Placement and Stop Collar Testing, First Edition
$42.00 $85.00
Recommended Practice for Classification of Locations for Electrical Installations at Petroleum Facilities Classified as Class I, Zone 0, Zone 1, and Zone 2
$113.00 $227.00
Effects of Sampling and Analytical Procedures on the Measurement of Geochemical Indicators of Intrinsic Bioremediation: Laboratory and Field Studies
$72.00 $144.00
API Standards 620, 650, and 653 Interpretations -- Tank Construction and In-Service Inspection - Answers to Technical Inquiries
$94.00 $188.00
Air-Cooled Heat Exchangers for General Refinery Services