Your shopping cart is empty!
PDF Preview
American Petroleum Institute, 08/01/2004
Publisher: API
File Format: PDF
$42.00$85.00
Published:01/08/2004
Pages:24
File Size:1 file , 910 KB
Note:This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran
Provides calculations for determining centralizer spacing, based on centralizer performance and desired standoff, in deviated and dogleg holes in wells for the petroleum and natural gas industries. It also provides a procedure for testing stop collars and reporting test results. This edition of API RP 10D-2 is the identical national adoption of ISO 10427-2, Petroleum and natural gas industries-Equipment for well cementing-Part 2: Centralizer placement and stop-collar testing
Recommended Practice for Centralizer Placement and Stop Collar Testing, First Edition
$42.00 $85.00
Recommended Practices on Measuring the Viscous Properties of a Cross-Linked Water-Based Fracturing Fluid
$72.00 $144.00
Analysis and Reduction of Toxicity in Biologically Treated Petroleum Product Terminal tank Bottoms Water
A Range Finding Developmental Inhalation Toxicity Study of Unleaded Gasoline Vapor Condensate in Rats and Mice via Whole Body Exposures
$54.00 $108.00
Steels for Hydrogen Service at Elevated Temperatures and Pressures in Petroleum Refineries and Petrochemical Plants
$101.00 $203.16