Your shopping cart is empty!
PDF Preview
American Petroleum Institute, 12/01/2022
Publisher: API
File Format: PDF
$51.00$103.00
Published:01/12/2022
Pages:37
File Size:1 file , 1.2 MB
Note:This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran
This Recommeded Practice (RP) applies to all parts of a pipeline or pipeline facility including line pipe, pump station piping, terminal piping, compressor station piping, metering station piping, delivery station piping, regulator station piping, appurtenances connected to line pipe, appurtenances connected to facility piping, fabricated assemblies, valves, tees, elbows, reducers, flanges, and any other pipeline equipment or appurtenances.
This RP does not apply to pumping units, compressor units, breakout tanks, pressure vessels, control piping, sample piping, instrument piping/tubing, or any component or piping system for which other codes specify pressure testing requirements (i.e. ASME Boiler and Pressure Vessel Code, piping systems covered by building codes).
This RP does not address piping systems that are pressure tested with natural gas, nitrogen, or air.
Pressure Testing of Steel Pipelines for the Transportation of Gas, Petroleum Gas, Hazardous Liquids, Highly Volatile Liquids, or Carbon Dioxide, Seventh Edition
$51.00 $103.00
Fugitive Emissions from Refinery Process Drains, Volume III, Process Drain Emission Calculator: APIDRAIN Version 1.0
$113.00 $227.14
Summary of U.S. Occupational Injuries, Illnesses, and Fatalities in the Petroleum Industry, 1998
$72.00 $144.00
Fugitive Emissions from Refinery Process Drains Volume I - Fugitive Emission Factors for Refinery Process Drains
Bulletin on Formulas and Calculations for Casing, Tubing, Drill Pipe, and Line Pipe Properties
$6.00 $12.00