API RP 2A-WSD (R2010)

Planning, Designing and Constructing Fixed Offshore Platforms - Working Stress Design - Includes Supplement 2

American Petroleum Institute, 12/01/2000

Publisher: API

File Format: PDF

$107.00$214.00


Published:01/12/2000

Pages:274

File Size:1 file , 4.7 MB

Note:This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran

Includes all current errata and supplements.

Contains requirements for the design and construction of new platforms and for the relocation of existing platforms used for drilling, development, and storage of hydrocarbons in offshore areas. In addition, guidelines are provided for the assessment of existing platforms in the event that it becomes necessary to make a determination of the "fitness for purpose" of the structure.

API RP 2A-WSD (R2010) history

API RP 2A-WSD (R2010)

API RP 2A-WSD (R2010)

Planning, Designing and Constructing Fixed Offshore Platforms - Working Stress Design - Includes Supplement 2

$107.00 $214.00

More API standard pdf

API 2U

API 2U

Bulletin on Stability Design of Cylindrical Shells

$72.00 $144.00

API MPMS Chapter 5.3

API MPMS Chapter 5.3

Metering: Measurement of Liquid Hydrocarbons by Turbine Meters

$72.00 $144.00

API 2V

API 2V

Design of Flat Plate Structures

$72.00 $144.00

API Publ 1161

API Publ 1161

Guidance Document for the Qualification of Liquid Pipeline Personnel

$72.00 $144.00