Your shopping cart is empty!
PDF Preview
American Petroleum Institute, 06/01/2021
Publisher: API
File Format: PDF
$74.00$148.00
Published:01/06/2021
Pages:52
File Size:1 file , 1.4 MB
Note:This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran
This document provides guidance for the design, placement, and verification of cement plugs in wells to be temporarily or permanently abandoned, as well as remediation and verification of annular barriers. Wells temporarily abandoned (suspended) are intended to be re-entered in the future. The placement of barriers may depend on whether the well is to be temporarily or permanently abandoned. Cement plug lengths are not considered in this document.
The Generation and Management of Wastes and Secondary Materials in the Petroleum Refining Industry: 1987-1988
$72.00 $144.00
Standard Test Method for Sediment in Crude Oil by Membrane Filtration
Cleaning Mobile Tanks in Flammable or Combustible Liquid Service
$22.00 $45.00
Recommended Practices for Evaluation of Well Perforators