• API RP 95F

API RP 95F

Interim Guidance for Gulf of Mexico MODU Mooring Practice-2006 Hurricane Season, First Edition

American Petroleum Institute, 05/01/2006

Publisher: API

File Format: PDF

$72.00$144.00


Published:01/05/2006

Pages:39

File Size:1 file , 740 KB

Note:This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran

This recommended practice supplements API RP 2SK for Gulf Of Mexico MODU mooring design and operation practice during the hurricane season. Topics addressed herein that will be part of the overall mooring design and MODU operations include:
  • Site and well-specific data
  • Design criteria for the mooring
  • Indicative GOM hurricane extreme metocean conditions
  • Mooring analysis
  • Site-specific risk assessment and mitigation
  • Mooring hardware issues such as anchor system and mooring system upgrade
  • Mooring operation issues such as deployment, hurricane preparedness, and inspection

More API standard pdf

API Spec 6FC (R2006)

API Spec 6FC (R2006)

Fire Test for Valve with Automatic Backseats, Includes Errata 1 (2008)

$72.00 $144.00

API TR 6F2

API TR 6F2

Technical Report on Fire Resistance Improvements for API Flanges, 3rd Edition

$72.00 $144.00

API Publ 4666

API Publ 4666

The Toxicity of Common Ions to Freshwater and Marine Organisms

$72.00 $144.00

API TR 6F1

API TR 6F1

Technical Report on Performance of API an ANSI End Connections in a Fire Test According to API Specification 6FA, 3rd Edition

$72.00 $144.00