API TR 5TP

Torque-Position Assembly Guidelines for API Casing and Tubing Connections, FIrst Edition

American Petroleum Institute, 12/01/2013

Publisher: API

File Format: PDF

$64.00$128.00


Published:01/12/2013

Pages:30

File Size:1 file , 1.9 MB

Note:This product is unavailable in Russia, Cuba, Syria, North Korea, Ukraine, Belarus, Iran

Please note that any addenda or errata may not be included in translated editions of this standard.

This document provides alternative connection assembly procedures to those found in API 5B (power turns) and those found in API 5C1 (optimum torque). The procedures set forth are referred to as "torque-position" because the make-up torque and final position are used as acceptance criteria for the assembly operation. The connections are threaded in accordance with API 5B. The torque-position assembly parameters have been developed for most SC (short round thread casing), LC (long round thread casing), BC (buttress thread casing), and EU (external upset tubing) connections.

Torque-position is a precision assembly method that relies on a controlled process for successful implementation. When defined threading and assembly procedures are followed, the performance of the resulting assembled connection is optimized.

More API standard pdf

API Publ 332

API Publ 332

Comparison of Screening Values from Selected Hydrocarbon Screening Instruments

$72.00 $144.00

API MPMS Chapter 3.2 (R2013)

API MPMS Chapter 3.2 (R2013)

Tank Gauging: Gauging Petroleum and Petroleum Products in Tank Cars, First Edition

$54.00 $108.00

API 1560

API 1560

Lubricant Service Designations for Automotive Manual Transmissions, Manual Transaxles and Axles

$72.00 $144.00

API Publ 535

API Publ 535

Burners for Fired Heaters in General Refinery Services

$72.00 $144.00