Your shopping cart is empty!
American Society of Civil Engineers, 05/04/2021
Publisher: ASCE
File Format: PDF
$40.00$80.00
Published:04/05/2021
Pages:48
File Size:1 file , 2 MB
Note:This product is unavailable in Russia, Ukraine, Belarus
Prepared by the Standards Committee for Identifying, Quantifying, and Proving Loss of Productivity of the Construction Institute of ASCE
Identifying, Quantifying, and Proving Loss of Productivity, ANSI/ASCE/CI 71-21, describes key labor costs as typically the most variable, and a major component of, overall project cost. It provides guidance on tracking and measuring labor productivity to help prevent, mitigate, and recover cost overruns and to address loss of productivity disputes and claims, which are increasing in frequency and magnitude.
Topics include defining productivity and related terms; preparing, collecting, validating, and analyzing productivity data; detecting the presence and extent of disruptive events; preferred methodologies for quantifying productivity loss; and avoiding conditions that create productivity loss.
ASCE 71-21 is written from and applicable to a variety of perspectives, including but not limited to those of owners, designers, contractors, attorneys, mediators, triers-of-fact, educators, and researchers; construction-only, design-only, and design-construct projects; small and large projects; public and private work; and international and domestic contexts.
Standard Guidelines for the Design of Urban Subsurface Drainage (ANSI / ASCE 12-92) Standard Guidelines for Installation of Urban Subsurface Drainage (ASCE 13-93) Standard Guidelines for Operation and Maintenance of Urban Subsurface Drainage (ASCE 14-93)
$18.00 $36.00
Design and Construction of Urban Stormwater Management Systems (MOP 77)
$63.00 $126.00
Standard for the Structural Design of Composite Slabs (ANSI/ASCE 3-91) and Standard Practice for Construction and Inspection of Composite Slabs (ANSI /ASCE 9-91)
$26.00 $53.00
Structural Fire Protection (MOP 78)
$66.00 $132.00