ASME ANS RA-S-1.1-2022

Standard for Level 1/Large Early Release Frequency Probabilistic Risk Assessment for Nuclear Power Plant Applications

ASME International, 05/31/2022

Publisher: ASME

File Format: PDF

$305.00$610.00


Published:31/05/2022

Pages:402

File Size:1 file , 2.2 MB

Note:This product is unavailable in Ukraine, Russia, Belarus

This Standard states requirements for a Level 1 PRA of internal and external hazards while at-power for the evaluation of core damage frequency (CDF). In addition, this Standard states requirements for a limited Level 2 PRA sufficient to evaluate large early release frequency (LERF). The only hazards explicitly excluded from the scope are accidents resulting from purposeful human-induced security threats (e.g., sabotage, terrorism). These requirements are written for operating LWR power plants (i.e., plants with designs and features similar to the plants operating when this Standard was published). They may be used for LWR plants under design or construction or for advanced LWRs, but revised or additional requirements may be needed.

More ASME standard pdf

ASME B107.410-2018

ASME B107.410-2018

Struck Tools

$45.00 $90.00

ASME B30.24-2018 (R2023)

ASME B30.24-2018 (R2023)

Container Cranes: Safety Standard for Cableways, Cranes, Derricks, Hoists, Hooks, Jacks, and Slings

$22.00 $45.00

ASME B31Q-2018

ASME B31Q-2018

Pipeline Personnel Qualification

$162.00 $325.00

ASME PCC-2-2018

ASME PCC-2-2018

Repair of Pressure Equipment and Piping

$82.00 $165.00