• ASME B107.20-2004

ASME B107.20-2004

Pliers: Lineman's, Iron Worker's, Gas, Glass, Fence, and Battery

ASME International, 01/01/2004

Publisher: ASME

File Format: PDF

$19.00$38.00


Published:01/01/2004

Pages:20

File Size:1 file , 260 KB

Note:This product is unavailable in Ukraine, Russia, Belarus

This Standard provides performance and safety requirements for pliers having gripping surfaces and/or cutting edges. Inclusion of dimensional data in this Standard does not mean that products described herein are stock production sizes. Consumers should consult with manufacturers concerning a list of stock production sizes. This Standard may be used as a guide by state authorities or other regulatory bodies in the formulation of laws or regulations. It is also intended for voluntary use by establishments that use or manufacture the covered tools. Consumers are requested to consult with manufacturers concerning lists of stock production sizes.

ASME B107.20-2004 history

ASME B107.20-2004

ASME B107.20-2004

Pliers: Lineman's, Iron Worker's, Gas, Glass, Fence, and Battery

$19.00 $38.00

More ASME standard pdf

ASME BPVC-III-3-2007

ASME BPVC-III-3-2007

2007 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Division 3: Containment Systems and Transportation Packaging of Spent Nuclear Fuel and High-Level Radioactive Waste, Includes Addenda (2008 and 2009)

$123.00 $246.25

ASME BPVC-III-2-2007

ASME BPVC-III-2-2007

2007 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Division 2: Code for Concrete Reactor Vessels and Containments, Includes Addenda (2008 and 2009)

$123.00 $246.98

ASME BPVC-IIB-2007

ASME BPVC-IIB-2007

2007 ASME Boiler and Pressure Vessel Code, Section II: Materials - Part B: Nonferrous Material Specifications, Includes Addenda (2008 and 2009)

$130.00 $260.67

ASME BPVC-III NG-2007

ASME BPVC-III NG-2007

2007 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Division 1, Subsection NG: Core Support Structures, Includes Addenda (2008 and 2009)

$100.00 $201.28