ASME B30.18-2016

Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist)

ASME International, 08/26/2016

Publisher: ASME

File Format: PDF

$26.00$53.00


Published:26/08/2016

Pages:40

File Size:1 file , 790 KB

Note:This product is unavailable in Ukraine, Russia, Belarus

B30.18 applies to the construction, installation, operation, inspection, and maintenance of hand-powered and power-driven overhead and gantry cranes that have a top or under running multiple girder bridge with a vertically guided carriage, with or without a top or under running trolley. The requirements included in this volume also apply to stacker cranes having the same fundamental characteristics, such as cantilever gantry and semi-gantry stacker cranes.

ASME B30.18-2016 history

ASME B30.18-2016

ASME B30.18-2016

Stacker Cranes (Top or Under Running Bridge, Multiple Girder with Top or Under Running Trolley Hoist)

$26.00 $53.00

More ASME standard pdf

ASME BPVC-IIB-1983

ASME BPVC-IIB-1983

1983 ASME Boiler and Pressure Vessel Code, Section II: Materials - Part B: Nonferrous Material Specifications

$138.00 $277.30

ASME BPVC-IIC-1983

ASME BPVC-IIC-1983

1983 ASME Boiler and Pressure Vessel Code, Section II: Materials - Part C: Specifications for Welding Rods, Electrodes and Filler Metals

$145.00 $290.48

ASME BPVC-III NC-1983

ASME BPVC-III NC-1983

1983 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Division 1, Subsection NC: Class 2 Components

$148.00 $297.22

ASME BPVC-III NCA-1983

ASME BPVC-III NCA-1983

1983 ASME Boiler and Pressure Vessel Code, Section III: Rules for Construction of Nuclear Power Plant Components, Subsection NCA: General Requirements for Division 1 and Division 2

$111.00 $222.88