Your shopping cart is empty!
PDF Preview
ASME International, 09/30/2021
Publisher: ASME
File Format: PDF
$29.00$59.00
Published:30/09/2021
Pages:38
File Size:1 file , 460 KB
Note:This product is unavailable in Ukraine, Russia, Belarus
B30.18 applies to the construction, installation, operation, inspection, and maintenance of hand-powered and power-driven overhead and gantry cranes that have a top or under running multiple girder bridge with a vertically guided carriage, with or without a top or under running trolley. The requirements included in this volume also apply to stacker cranes having the same fundamental characteristics, such as cantilever gantry and semi-gantry stacker cranes.
2010 ASME Boiler & Pressure Vessel Code (BPVC) - Section III - Rules for Construction of Nuclear Power Plant Components - COMPLETE 11-Volume SET, Includes 2011 Addenda Reprint
$2,962.00 $5,925.00
Manufactured Safety Vacuum Release Systems (SVRS) for Residential and Commercial Swimming Pool, Spa, Hot Tub, and Wading Pool Suction Systems
$24.00 $49.00
Rigging Hardware, Includes Errata (2011)
$25.00 $50.00
Section VIII-Division 2 Example Problem Manual
$87.00 $175.00