ASME BPVC.XI.2-2023

2023 ASME Boiler and Pressure Vessel Code, Section XI: Rules for Inservice Inspection of Nuclear Reactor Facility Components - Division 2: Requirements for Reliability and Integrity Management (RIM) Programs for Nuclear Reactor Facilities

ASME International, 07/01/2023

Publisher: ASME

File Format: PDF

$410.00$820.00


Published:01/07/2023

Pages:151

Note:This product is unavailable in Ukraine, Russia, Belarus

Please note: the format of this publication is loose-leaf. Please visit this page if you would like to add a binder to your order.

The rules of Section XI constitute requirements to maintain the nuclear reactor facility and to return the facility to service, following facility outages, in a safe and expeditious manner.

Section XI - Division 2 provides the requirements for establishing Reliability and Integrity Management (RIM) Programs for any type of nuclear reactor facility. The program shall include the following elements:

  • Owner’s responsibility
  • Areas subject to inspection or monitoring or both
  • Provisions for accessibility and inspection
  • Examination methods and procedures
  • Personnel qualifications
  • Frequency of inspection
  • Record keeping and report requirements
  • Procedures for evaluation of inspection and monitoring results and subsequent disposition of results of evaluations
  • Repair and replacement activity requirements, including procurement, design, welding, brazing, defect removal, fabrication, installation, examination, and leakage testing

The RIM Program addresses a facility's entire life cycle. It is applicable over the entire life of the facility and includes each passive structure, system, or component (SSC) that is in its scope. It specifies a combination of monitoring, examination, tests, operation, and maintenance requirements that ensure SSCs meet the facility risk and reliability goals (i.e., Reliability Targets) that are selected for the RIM Program.

Division 2 rules also stipulate duties of the Authorized Nuclear Inservice Inspector to verify that the program has been completed, implemented, and updated in accordance with the requirements of Division 2.

Application of Division 2 begins when the requirements of the Construction Code have been satisfied. It is applicable regardless of the Construction Code classification used for an SSC if the SSC is designated as important to the safety and reliability of an operating facility.

Careful application of this Section will help users to comply with applicable regulations within their jurisdictions, while achieving the operational, cost and safety benefits to be gained from the many industry best-practices detailed within these volumes.

More ASME standard pdf

Theoretical Steam Rate Tables
ASME PTC 32.1-1969(R1992)

ASME PTC 32.1-1969(R1992)

Nuclear Steam Supply Systems

$147.00 $295.13

ASME PTC 4.3-1968 (R1991)

ASME PTC 4.3-1968 (R1991)

Air Heaters

$27.00 $55.00

ASME B31.2-1968

ASME B31.2-1968

Fuel Gas Piping

$28.00 $56.00