ASME NOG-1-2010

Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)

ASME International, 07/12/2010

Publisher: ASME

File Format: PDF

$85.00$170.00


Published:12/07/2010

Pages:180

File Size:1 file , 1.4 MB

Note:This product is unavailable in Ukraine, Russia, Belarus

This Standard covers electric overhead and gantry multiple girder cranes with top running bridge and trolley used at nuclear facilities and components of cranes at nuclear facilities.

More ASME standard pdf

ASME B20.1-2012

ASME B20.1-2012

Safety Standards for Conveyors and Related Equipment

$26.00 $52.00

ASME Y14.41-2012

ASME Y14.41-2012

Digital Product Definition Data Practices

$67.00 $135.00

ASME CSD-1-2012

ASME CSD-1-2012

Controls and Safety Devices for Automatically Fired Boilers

$46.00 $93.00

ASME PTC 19.3 TW-2010 Errata (2012)

ASME PTC 19.3 TW-2010 Errata (2012)

Errata to Thermowells

$140.00 $280.22