ASME NOG-1-2010

Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)

ASME International, 07/12/2010

Publisher: ASME

File Format: PDF

$85.00$170.00


Published:12/07/2010

Pages:180

File Size:1 file , 1.4 MB

Note:This product is unavailable in Ukraine, Russia, Belarus

This Standard covers electric overhead and gantry multiple girder cranes with top running bridge and trolley used at nuclear facilities and components of cranes at nuclear facilities.

More ASME standard pdf

ASME A17.1/CSA B44-2004 Handbook

ASME A17.1/CSA B44-2004 Handbook

Handbook on Safety Code for Elevators and Escalators

$107.00 $215.00

ASME A17.2-2004

ASME A17.2-2004

Guide for Inspection of Elevators, Escalators, and Moving Walks

$82.00 $165.00

ASME B31.3-2004

ASME B31.3-2004

Process Piping

$152.00 $305.00

ASME B73.2-2003 (R2008)

ASME B73.2-2003 (R2008)

Specifications for Vertical In-Line Centrifugal Pumps for Chemical Process

$24.00 $49.00