Your shopping cart is empty!
ASTM International, 05/01/2014
Publisher: ASTM
File Format: PDF
$31.00$62.00
Published:01/05/2014
Pages:5
File Size:1 file , 140 KB
Note:This product is unavailable in Russia, Ukraine, Belarus
1.1 This practice describes procedures, soils, and soil placement for the proper installation of corrugated aluminum culverts and storm sewers in either trench or projection installations. A typical trench installation is shown in Fig. 1, and a typical embankment (projection) installation is shown in Fig. 2. The pipes described in this practice are manufactured in a factory and furnished to the job in lengths ordinarily from 10 to 30 ft [3 to 9 m], with 20 ft [6 m] being common, for field joining. This practice applies to structures designed in accordance with Practice B790/B790M.
1.2 The values stated in either SI units or inch-pound units are to be regarded separately as standard. The values stated in each system may not be exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in non-conformance with the standard.
1.2.1 SI Units-SI units are shown in the text in brackets, and they are the applicable values for metric installation.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
Standard Test Method for High Speed Puncture Properties of Plastics Using Load and Displacement Sensors
$30.00 $60.00
Standard Practice for Determination of Skin Contact Temperature from Heated Surfaces Using a Mathematical Model and Thermesthesiometer
Standard Specification for Polyethylene Upright Storage Tanks
Standard Practice for Estimation of Chlorine Demand of Water
$26.00 $52.00