Your shopping cart is empty!
ASTM International, 05/01/2011
Publisher: ASTM
File Format: PDF
$30.00$60.00
Published:01/05/2011
Pages:6
File Size:1 file , 150 KB
Note:This product is unavailable in Russia, Ukraine, Belarus
1.1 This practice covers procedures, soils, and soil placement for the proper installation of corrugated aluminum structural plate culverts and sewers in either trench or embankment installations. A typical trench installation is shown in Fig. 1, and a typical embankment (projection) installation is shown in Fig. 2. Structural plate structures as described herein are those structures factory fabricated in plate form and bolted together on site to provide the required shape, size, and length of structure. This practice applies to structures designed in accordance with Practice B790/B790M.
1.2 The values stated in either inch-pound units or SI units are to be regarded separately as standard. Within the text, the SI units are shown in brackets. The values stated in each system are not exact equivalents; therefore, each system shall be used independently of the other. Combining values from the two systems may result in nonconformance with the standard.
1.3 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
Standard Guide for Industrial Thermal Insulation Systems
$41.00 $83.00
Standard Specification for Installation of Lathing and Furring to Receive Interior and Exterior Portland Cement-Based Plaster
$29.00 $58.00
Standard Test Methods for Rheological Properties of Non-Newtonian Materials by Rotational Viscountess
Standard Test Method for Specific Gravity of Fired Ceramic Whiteware Materials
$26.00 $52.00