Your shopping cart is empty!
ASTM International, 10/10/1999
Publisher: ASTM
File Format: PDF
$25.00$50.00
Published:10/10/1999
Pages:3
File Size:1 file , 130 KB
Note:This product is unavailable in Russia, Ukraine, Belarus
1.1 This practice covers common installation requirements for temporary silt fence applications. This practice is based on AASHTO M288.
1.2 This practice is applicable to the use of silt fence as a vertical permeable interceptor designed to remove suspended soil from overland, nonconcentrated water flow. The function of a temporary silt fence is to trap and allow settlement of soil particles from sediment laden water. The purpose is to greatly limit the transport of eroded soil from the a construction site by water runoff.
1.3 The practices presented herein are intended to ensure good workmanship and quality and are not necessarily adequate for all purposes in view of the wide variety of possible sediments and performance objectives.
1.4 The values stated in SI units are to be regarded as the standard. The values in inch-pound units are provided for information only.
1.5 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.
Standard Test Method for Cyclic Thermal Shock of SBS-Modified Bituminous Roofing Sheets with Factory-Applied Metal Surface
$29.00 $58.00
Standard Test Method for Evaluating Degree of Checking of Exterior Paints
$30.00 $60.00
Standard Test Method for Indicating Wear Characteristics of Petroleum Hydraulic Fluids in a High Pressure Constant Volume Vane Pump
Standard Specification for Pressure Vessel Plates, Five Percent Nickel Alloy Steel, Specially Heat Treated
$26.00 $52.00