• ASTM D7278-11

ASTM D7278-11

Standard Guide for Prediction of Analyzer Sample System Lag Times

ASTM International, 10/15/2011

Publisher: ASTM

File Format: PDF

$30.00$60.00


Published:15/10/2011

Pages:9

File Size:1 file , 130 KB

Note:This product is unavailable in Russia, Ukraine, Belarus

1.1 This guide covers the application of routine calculations to estimate sample system lag time, in seconds, for gas, liquid, and mixed phase systems.

1.2 This guide considers the sources of lag time from the process sample tap, tap conditioning, sample transport, pre-analysis conditioning and analysis.

1.3 Lag times are estimated based on a prediction of flow characteristics, turbulent, nonturbulent, or laminar, and the corresponding purge requirements.

1.4 Mixed phase systems prevent reliable representative sampling so system lag times should not be used to predict sample representation of the stream.

This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

More ASTM standard pdf

ASTM D2526-97

ASTM D2526-97

Standard Specification for Ozone-Resisting Silicone Rubber Insulation for Wire and Cable

$25.00 $50.00

ASTM B813-00e1

ASTM B813-00e1

Standard Specification for Liquid and Paste Fluxes for Soldering of Copper and Copper Alloy Tube

$30.00 $60.00

ASTM D4796-17(2022)

ASTM D4796-17(2022)

Standard Test Method for Bond Strength of Thermoplastic Pavement Marking Materials

$28.00 $57.00

ASTM C1774-13

ASTM C1774-13

Standard Guide for Thermal Performance Testing of Cryogenic Insulation Systems

$43.00 $86.00