Your shopping cart is empty!
ASTM International, 11/01/2011
Publisher: ASTM
File Format: PDF
$41.00$83.00
Published:01/11/2011
Pages:20
File Size:1 file , 1000 KB
Note:This product is unavailable in Russia, Ukraine, Belarus
1.1 Based on the UNIFORMAT II format for organizing building data, established in Classification E1557, and depending on the level where measurement is applied (industry, total job, or building element), JPM measures construction productivity at three levels: task, project, and industry (shown in Fig. 1). By comparing labor hours used against CPIP, JPM allows for unified measurement of established building elements (according to the UNIFORMAT II format. This practice establishes a process for measuring construction job productivity by comparing labor usage to CPIP.
1.2 JPM measures labor productivity of the installation processes on a construction job.
1.3 CPIP is measured with input from the labor performing the installation, utilizing elements of statistical process control (SPC) and industrial engineering.
1.4 JPM takes into account the difficulty of installation at any given point on a job.
1.5 JPM evaluates relative productivity changes using trend monitoring.
FIG. 1 Measurement of Productivity at the Industry, Project, and Task Level
Standard Test Method for Maturity of Cotton Fibers (Sodium Hydroxide Swelling and Polarized Light Procedures)
$24.00 $48.00
Standard Guide for Displaying the Results of Chemical Analyses of Groundwater for Major Ions and Trace Elements—Use of Maps (Withdrawn 2023)
$34.00 $68.00
Standard Test Method for Rapid Determination of the Methylene Blue Value for Fine Aggregate or Mineral Filler Using a Colorimeter
$23.00 $46.00
Standard Guide for Seismic Risk Assessment of Buildings
$28.00 $56.00