• ASTM E3010-15

ASTM E3010-15

Standard Practice for Installation, Commissioning, Operation, and Maintenance Process (ICOMP) of Photovoltaic Arrays

ASTM International, 03/01/2015

Publisher: ASTM

File Format: PDF

$32.00$65.00


Published:01/03/2015

Pages:11

File Size:1 file , 870 KB

Note:This product is unavailable in Russia, Ukraine, Belarus

1.1 This practice details the minimum requirements for installation, commissioning, operations, and maintenance processes to ensure safe and reliable power generation for the expected life of the photovoltaic system. Specifically dealing with commercial photovoltaic installations, this practice covers a broad spectrum of designs and applications and is focused on the proper process to ensure quality.

1.2 This practice does not cover the electrical aspects of installation found in existing and national codes and does not replace or supersede details of electrical installation covered by the same. The practice does address the integration of best practices into design and construction.

1.3 This practice shall not dictate specific design criteria or favor any product or technology.

1.4 This practice shall be focused on the proper, documented process required to build and operate a quality PV plant as defined in Section 3.

1.5 Integration of best practices shall be relevant to this standard and promote a mechanism for rapid evolution and reaction to changes or events. Conformity assessment for PV power plants is being developed through the IEC System for Certification to Standards Relating to Equipment for Use in Renewable Energy Applications (IECRE System). Sandia Labs has developed several model documents that may be adopted as acceptable consensus standards through other standards development organizations.

1.6 The standard is divided into three key areas:

1.6.1 Design, engineering, and construction of the PV plant. Systems should be designed with operation and maintenance (O&M) in mind. Further standards should be developed for building integrated or building mounted systems, modules with embedded power electronics, lightweight flexible modules, or other specific components.

1.6.2 Commissioning, testing, and approval for power generation (Utility Witness Testing). Standards for owner acceptance will also be addressed.

1.6.3 O&M of the PV plant including performance monitoring, periodic inspection, preventive maintenance, and periodic re-commissioning.

1.7 Safety and hazard considerations unique to this application, such as worker fall protection, electrical exposure, accessibility of modules, and roof clearance (around the perimeter of the array) are addressed by other codes, standards, or authorities having jurisdiction.

1.8 This practice provides guidelines for minimum processes required and must be used in conjunction with applicable codes and standards, government regulations, manufacturer requirements, and best practices.

1.9 This practice is not intended to replace or supersede any other applicable local codes, standards or Licensed Design Professional instructions for a given installation.

1.10 This standard does not purport to address all of the safety concerns, if any, associated with its use. It is the responsibility of the user of this standard to establish appropriate safety and health practices and determine the applicability of regulatory limitations prior to use.

More ASTM standard pdf

ASTM D4570-02(2007)

ASTM D4570-02(2007)

Standard Test Method for Rubber Chemicals-Determination of Particle Size of Sulfur by Sieving (Dry)

$26.00 $52.00

ASTM D4929-07

ASTM D4929-07

Standard Test Methods for Determination of Organic Chloride Content in Crude Oil

$30.00 $60.00

ASTM D5289-07a

ASTM D5289-07a

Standard Test Method for Rubber Property-Vulcanization Using Rotorless Cure Meters

$30.00 $60.00

ASTM D5992-96(2006)e1

ASTM D5992-96(2006)e1

Standard Guide for Dynamic Testing of Vulcanized Rubber and Rubber-Like Materials Using Vibratory Methods

$43.00 $86.00