Your shopping cart is empty!
ASTM International, 01/01/1998
Publisher: ASTM
File Format: PDF
$29.00$58.00
Published:01/01/1998
Pages:9
File Size:1 file , 100 KB
Note:This product is unavailable in Russia, Ukraine, Belarus
1.1 This practice presents a procedure for calculating and interpreting benefit-to-cost ratios (BCR) and savings-to-investment ratios (SIR) as an aid for making building-related decisions.
1.2 A basic premise of the BCR and SIR methods is that future as well as present benefits and costs arising from a decision are important to that decision, and, if measurable in dollars, should be included in calculating the BCR and SIR.
1.3 Dollar amounts used to calculate BCR and SIR are all discounted, that is, expressed in time-equivalent dollars, either in present value or uniform annual value terms.
Standard Practice for Single- and Multi-Level Continuous Sampling of a Stream of Product by Attributes Indexed by AQL
$44.00 $89.00
Standard Test Method for Relative Resistance to Wear of Unglazed Ceramic Tile by the Taber Abraser
$26.00 $52.00
Standard Specification for Toluene Diisocyanate
Standard Specification for Shock-Absorbing Properties of North American Football Field Playing Systems as Measured in the Field
$25.00 $50.00