Your shopping cart is empty!
ASTM International, 01/01/1998
Publisher: ASTM
File Format: PDF
$29.00$58.00
Published:01/01/1998
Pages:9
File Size:1 file , 100 KB
Note:This product is unavailable in Russia, Ukraine, Belarus
1.1 This practice presents a procedure for calculating and interpreting benefit-to-cost ratios (BCR) and savings-to-investment ratios (SIR) as an aid for making building-related decisions.
1.2 A basic premise of the BCR and SIR methods is that future as well as present benefits and costs arising from a decision are important to that decision, and, if measurable in dollars, should be included in calculating the BCR and SIR.
1.3 Dollar amounts used to calculate BCR and SIR are all discounted, that is, expressed in time-equivalent dollars, either in present value or uniform annual value terms.
Standard Test Method for Analysis of Nickel Alloys by Inductively Coupled Plasma Atomic Emission Spectrometry (Performance-Based Method)
$31.00 $62.00
Standard Specification for Metal Insert Fittings Utilizing a Copper Crimp Ring for SDR9 Cross-linked Polyethylene (PEX) Tubing
$29.00 $58.00
Standard Terminology Relating to Polymeric Biomaterials in Medical and Surgical Devices
Standard Guide for Carbon Black -- Validation of Test Method Precision and Bias
$33.00 $67.00