Your shopping cart is empty!
American Welding Society, 04/24/1992
Publisher: AWS
File Format: PDF
$35.00$70.00
Published:24/04/1992
Pages:23
Note:This product is unavailable in Ukraine, Russia, Belarus
Standard Welding Procedure Specification for Gas Tungsten Arc Welding of Carbon Steel, (M-I, Group 1), 10 through 18 Gauge, in the As-Welded Condition, With or Without Backing
$147.00 $294.56
Guide for Aluminum Hull Welding
$140.00 $281.16
STANDARD WELDING PROCEDURE SPECIFICATION (WPS) FOR SHIELDED METAL ARC WELDING OF CARBON STEEL, (M-1/P-1, GROUP 1 OR 2), 3/16 THROUGH 3/4 INCH, IN THE AS WELDED CONDITIONS WITH BACKING
$121.00 $243.51
STANDARD WELDING PROCEDURE SPECIFICATION (WPS) FOR GAS TUNGSTEN ARC WELDING OF CARBON STEEL, (M-1/P-1, GROUP 1 OR 2), 3/16 THROUGH 7/8 INCH, IN THE AS-WELDED CONDITION, WITH OR WITHOUT BACKING
$130.00 $261.77