• BS 5978-1:1983

BS 5978-1:1983

Safety and performance of gas-fired hot water boilers (60kW to 2 MW input)-Specification for general requirements

BSI Group, 08/28/1987

Publisher: BS

File Format: PDF

$125.00$251.46


Published:28/08/1987

Note:This product is unavailable in Ukraine, Russia, Belarus

Specifies general requirements including performance and safety requirements and methods of test, for gas-fired hot water boilers operating at internal pressures up to 4.5 bar and having heat inputs from 60 kW up to 2 MW inclusive, calculated on the gross calorific value.

All current amendments available at time of purchase are included with the purchase of this document.

More BS standard pdf

BS PD 7002:1995

BS PD 7002:1995

Essential requirements for connection of terminal equipment to analogue interfaces of public switched telecommunications networks using either the earth calling, the loop calling, disconnect clearing, the loop calling, guarded clearing or the loop calling, unguarded clearing signalling method

$175.00 $350.52

BS 6893-3.209:1995

BS 6893-3.209:1995

Flexible insulating sleeving for electrical purposes. Specification for requirements for individual types of sleeving-General purpose heat-shrinkable sleeving, flame retarded polyolefin shrink ratio 2:1

$76.00 $152.40

BS 8220-2:1995

BS 8220-2:1995

Guide for security of buildings against crime-Offices and shops

$226.00 $452.12

BS 7509:1995

BS 7509:1995

Industrial microwave heating installations. Test methods for determination of power output

$125.00 $251.46