• BS 6046-4:1981

BS 6046-4:1981

Use of network techniques in project management-Guide to resource analysis and cost control

BSI Group, 05/29/1981

Publisher: BS

File Format: PDF

$90.00$180.34


Published:29/05/1981

Pages:21

File Size:1 file

Note:This product is unavailable in Ukraine, Russia, Belarus

Provides guidance on the use of these two techniques as a natural extension of the use of time analysis as a means of improving the management of projects.

All current amendments available at time of purchase are included with the purchase of this document.

More BS standard pdf

BS B 33:1991

BS B 33:1991

Specification for copper-beryllium alloy wire and springs (solution treated (W) and precipitated)

$76.00 $152.40

BS 7463-1:1991

BS 7463-1:1991

Fibre furnish analysis of paper, board and pulps-General method

$76.00 $152.40

BS DD 193:1991

BS DD 193:1991

Method for recovery of bitumen binders by dichloromethane extraction (rotary film evaporator method)

$166.00 $332.74

BS 903-A46:1991

BS 903-A46:1991

Physical testing of rubber-Method for determination of the transmission rate of volatile liquids

$125.00 $251.46