• BS 6046-4:1981

BS 6046-4:1981

Use of network techniques in project management-Guide to resource analysis and cost control

BSI Group, 05/29/1981

Publisher: BS

File Format: PDF

$90.00$180.34


Published:29/05/1981

Pages:21

File Size:1 file

Note:This product is unavailable in Ukraine, Russia, Belarus

Provides guidance on the use of these two techniques as a natural extension of the use of time analysis as a means of improving the management of projects.

All current amendments available at time of purchase are included with the purchase of this document.

More BS standard pdf

BS PD CEN/TR 15371-2:2018

BS PD CEN/TR 15371-2:2018

Safety of toys. Interpretations-Replies to requests for interpretation of the chemical standards in the EN 71-series

$76.00 $152.40

BS PD ISO/TS 20131-1:2018

BS PD ISO/TS 20131-1:2018

Soil quality. Simple laboratory assessments for characterizing the denitrification in soil-Soil denitrifying enzymes activities

$125.00 $251.46

BS PD IEC TS 62885-1:2018

BS PD IEC TS 62885-1:2018

Surface cleaning appliances-General requirements on test material and test equipment

$76.00 $152.40

BS PD IEC TR 62240-2:2018

BS PD IEC TR 62240-2:2018

Process management for avionics. Electronic components capability in operation-Semiconductor microcircuit lifetime

$125.00 $251.46