• BS BIP 2026:2003

BS BIP 2026:2003

Whole Life-cycle Costing. Risk and risk responses

BSI Group, 11/01/2003

Publisher: BS

File Format: PDF

$31.00$63.49


Published:01/11/2003

Pages:264

Whole life-cycle costing (WLCC) is rapidly becoming the standard method for the long-term cost appraisal of buildings and civil infrastructure projects. It has become an essential tool for those involved in the design, construction, operation and risk analysis of construction projects. With its mixture of established theory, best practice and innovative approaches, this book will help you make more accurate assessments of the long term cost effectiveness of projects by providing a thorough grounding in the theory of WLCC; demonstrating how decision making uncertainty can be reduced by basing choices on sound risk management principles and identifying a systematic approach to planning the post occupancy costs.

More BS standard pdf

BS 10/30227229 DC

BS 10/30227229 DC

BS ISO/IEC 23007-3. Information technology. Rich media user interfaces. Part 3. Conformance and reference software

$108.00 $217.25

BS 10/30229287 DC

BS 10/30229287 DC

BS EN 417. Non-refillable metallic gas cartridges for liquefied petroleum gases, with or without a valve, for use with portable appliances. Construction, inspection, testing and marking

$122.00 $244.82

BS 10/30228907 DC

BS 10/30228907 DC

BS EN 16145. Sanitary tapware. Extractable outlets for sink and basin mixers. General technical specification

$134.00 $268.62

BS 10/30228455 DC

BS 10/30228455 DC

BS EN 16139. Furniture. Strength, durability and safety. Requirements for non-domestic seating

$135.00 $271.84