• BS BIP 2059

BS BIP 2059

Managing Successful Projects with PRINCE2. Reference manual

BSI Group, 04/29/2002

Publisher: BS

File Format: PDF

$104.00$209.20


Published:29/04/2002

PRINCE2 is an easy to follow structured method suitable for any type of project. The processes and techniques in PRINCE2 will help your project team cope with the risks, challenges and opportunities of today's rapidly changing environment.

More BS standard pdf

BS 6282-3:1982

BS 6282-3:1982

Devices with moving parts for the prevention of contamination of water by backflow-Specification for in-line anti-vacuum valves of nominal size up to and including DN 42

$76.00 $152.40

BS 6276:1982

BS 6276:1982

Specification for dimensions and identification code for mounting flanges and shaft ends for hydraulic fluid power pumps and motors

$125.00 $251.46

BS 3900-D6:1982

BS 3900-D6:1982

Methods of test for paints. Optical tests on paint films-Determination of contrast ratio (opacity) of light-coloured paints at a fixed spreading rate, using polyester film

$76.00 $152.40

BS 4360:1979

BS 4360:1979

Specification for weldable structural steels

$125.00 $251.46