• BS BIP 2061:2004

BS BIP 2061:2004

Managing Successful Programmes. Delivering business change in multi-project environments

BSI Group, 04/08/2003

Publisher: BS

File Format: PDF

$22.00$44.45


Published:08/04/2003

One of the factors determining success is how fast an organisation can move in order to meet new challenges. Managing change has therefore become a fundamental management skill requiring a consistent business approach. Managing Successful Programmes (MSP) provides you with the framework and strategies of Programme Management - an approach for managing change and delivering business benefits from a set of related projects.

All current amendments available at time of purchase are included with the purchase of this document.

More BS standard pdf

BS 07/30167591 DC

BS 07/30167591 DC

BS 10621. Thief resistant dual-mode lock assemblies

$125.00 $251.86

BS 07/30162638 DC

BS 07/30162638 DC

BS 50131-2-3. Alarm systems. Intrusion and hold-up systems. Part 2-3. Requirements for microwave detectors

$144.00 $289.45

BS 07/30169154 DC

BS 07/30169154 DC

BS ISO 28706-2. Vitreous and porcelain enamels. Determination of resistance to chemical corrosion. Part 2. Determination of resistance to chemical corrosion by boiling acids, neutral liquids and/or their vapours

$102.00 $205.47

BS 07/30169151 DC

BS 07/30169151 DC

BS ISO 28765. Vitreous and porcelain enamels. Design of bolted steel tanks for the storage or treatment of water or municipal or industrial effluents and sludges

$131.00 $262.97