• BS BIP 2061:2004

BS BIP 2061:2004

Managing Successful Programmes. Delivering business change in multi-project environments

BSI Group, 04/08/2003

Publisher: BS

File Format: PDF

$22.00$44.45


Published:08/04/2003

One of the factors determining success is how fast an organisation can move in order to meet new challenges. Managing change has therefore become a fundamental management skill requiring a consistent business approach. Managing Successful Programmes (MSP) provides you with the framework and strategies of Programme Management - an approach for managing change and delivering business benefits from a set of related projects.

All current amendments available at time of purchase are included with the purchase of this document.

More BS standard pdf

BS 09/30194529 DC

BS 09/30194529 DC

BS EN 15429-2. Sweepers. Part 2. Performance requirements and test methods

$137.00 $274.45

BS 09/30179909 DC

BS 09/30179909 DC

BS ISO 22155. Soil quality. Gas chromatographic determination of volatile aromatic and halogenated hydrocarbons and selected ethers. Static headspace method

$104.00 $209.20

BS 09/30175820 DC

BS 09/30175820 DC

BS ISO 22621-5. Plastics piping systems for the supply of gaseous fuels for maximum operating pressures up to and including 2 MPa (20 bar). Polyamide (PA). Part 5. Fitness for purpose of the system

$129.00 $259.41

BS 09/30181333 DC

BS 09/30181333 DC

BS ISO 22621-6. Plastics piping systems for the supply of gaseous fuels for maximum operating pressures up to and including 2 MPa (20 bar). Polyamide (PA). Part 6. Code of practice for design, handling and installation

$104.00 $208.31