BS PD 5500 AMD2 (09/19)

Specification for unfired fusion welded pressure vessels

BSI Group, 09/30/2019

Publisher: BS

File Format: PDF

$103.00$206.08


Published:30/09/2019

Pages:1056

BS PD 5500:2018+A2:2019 specifies requirements for the design, construction, inspection, testing and verification of compliance of new unfired fusion welded pressure vessels. The materials of construction are specified in Section 2. The term "pressure vessel" as used in this specification includes branches up to the point of connection to the connecting piping by bolting, screwing or welding, and supports, brackets or other attachments directly welded to the pressure containing shell. The term "unfired" excludes vessels that are subject to direct generated heat or flame impingement from a fired process. It does not exclude vessels subject to electrical heating or heated process streams.

More BS standard pdf

BS DD ISO/TS 29843-2:2011

BS DD ISO/TS 29843-2:2011

Soil quality. Determination of soil microbial diversity. Method by phospholipid fatty acid analysis (PLFA) using the simple PLFA extraction method

$66.00 $132.08

BS 6748:1986+A1:2011

BS 6748:1986+A1:2011

Specification for limits of metal release from ceramic ware, glassware, glass ceramic ware and vitreous enamel ware

$73.00 $147.32

BS 11/30246096 DC

BS 11/30246096 DC

BS EN ISO 14889. Ophthalmic optics. Spectacle lenses. Fundamental requirements for uncut finished lenses

$144.00 $289.48

BS PD ISO/TR 12705:2011

BS PD ISO/TR 12705:2011

Graphic technology. Laboratory test method for chemical ghosting in lithography

$76.00 $152.40