BS PD 5500:2015+A1:2015

Specification for unfired fusion welded pressure vessels

BSI Group, 04/30/2015

Publisher: BS

File Format: PDF

$1,085.00$2,171.70


Published:30/04/2015

Pages:1010

File Size:1 file , 29 MB

Note:This product is unavailable in Ukraine, Russia, Belarus

This Published Document specifies requirements for the design, construction, inspection, testing and verification of compliance of new unfired fusion welded pressure vessels. The materials of construction are specified in Section 2. The term "pressure vessel" as used in this specification includes branches up to the point of connection to the connecting piping by bolting, screwing or welding, and supports, brackets or other attachments directly welded to the pressure containing shell. The term "unfired" excludes vessels that are subject to direct generated heat or flame impingement from a fired process. It does not exclude vessels subject to electrical heating or heated process streams.

More BS standard pdf

BS 11/30250199 DC

BS 11/30250199 DC

BS EN 60974-10. Arc welding equipment. Part 10. Electromagnetic compatibility (EMC) requirements

$144.00 $289.61

BS 11/30249344 DC

BS 11/30249344 DC

BS EN 62047-19. Semiconductor devices. Micro-electromechanical devices. Part 19. Electronic compasses

$142.00 $285.09

BS 11/30246635 DC

BS 11/30246635 DC

BS EN ISO 10545-4. Ceramic tiles. Part 4. Determination of modulus of rupture and breaking strength

$106.00 $213.59

BS 11/30243078 DC

BS 11/30243078 DC

BS EN 1034-16. Safety of machinery. Safety requirements for the design and construction of paper making and finishing machines. Part 16. Paper and board making machines

$118.00 $236.72