BS PD 5500:2018

Specification for unfired fusion welded pressure vessels

BSI Group, 01/31/2018

Publisher: BS

File Format: PDF

$1,143.00$2,286.00


Published:31/01/2018

Pages:1026

File Size:1 file , 35 MB

Note:This product is unavailable in Ukraine, Russia, Belarus

BS PD 5500:2018 specifies requirements for the design, construction, inspection, testing and verification of compliance of new unfired fusion welded pressure vessels. The materials of construction are specified in Section 2. The term "pressure vessel" as used in this specification includes branches up to the point of connection to the connecting piping by bolting, screwing or welding, and supports, brackets or other attachments directly welded to the pressure containing shell. The term "unfired" excludes vessels that are subject to direct generated heat or flame impingement from a fired process. It does not exclude vessels subject to electrical heating or heated process streams.

More BS standard pdf

BS DD CEN/TS 15722:2009

BS DD CEN/TS 15722:2009

Road transport and traffic telematics. ESafety. ECall minimum set of data (MSD)

$90.00 $180.34

BS PD CEN/TR 81-10:2008

BS PD CEN/TR 81-10:2008

Safety rules for the construction and installation of lifts. Basics and interpretations-System of the EN 81 series of standards

$125.00 $251.46

BS DD CEN ISO/TS 21003-7:2008

BS DD CEN ISO/TS 21003-7:2008

Multilayer piping systems for hot and cold water installations inside buildings. Guidance for the assessment of conformity

$34.00 $69.09

BS DD CEN/TS 15747:2008

BS DD CEN/TS 15747:2008

Solid recovered fuels. 14C-based methods for the determination of the biomass content

$38.00 $77.22