BS PD CEN ISO/TS 16530-2:2015

Well integrity-Well integrity for the operational phase

BSI Group, 01/31/2016

Publisher: BS

File Format: PDF

$189.00$378.46


Published:31/01/2016

Pages:100

File Size:1 file , 5.8 MB

Note:This product is unavailable in Ukraine, Russia, Belarus

BS PD CEN ISO/TS 16530-2:2015 provides requirements and methods to the oil and gas industry to manage well integrity during the well operational phase.

The operational phase is considered to extend from handover of the well after construction, to handover prior to abandonment. This represents only the period during the life cycle of the well when it is being operated and is illustrated in Figure 1.

The scope of the Technical Specification includes:
  • A description of the processes required to assess and manage risk within a defined framework. The risk assessment process also applies when deviating from this Technical Specification.
  • The process of managing well integrity by operating wells in compliance with operating limits for all well types that are defined based on exposure of risk to people, environment, assets and reputation. The management of well integrity is supported by associated maintenance/monitoring plans, technical reviews and the management of change.
  • The assessment of existing assets (wells / fields) in order to start the process of Well Integrity Management in accordance with this technical specification.
  • The handover process required when changing from one activity to another during the operational phase.
The scope of the Technical Specification applies to all wells that are utilized by the oil and gas industry, regardless of their age, type or location.

The scope of the Technical Specification does NOT apply to:
  • The periods during well intervention or work-over activities but it DOES include the result of the intervention and any impact that this can have to the well envelope and the associated well barriers.
  • The equipment that is required or used outside the well envelope for a well intervention such as wire-line or coiled tubing or a pumping package.

Cross References:
ISO 10417:2004
ISO 9004
ISO 14224
ISO 17776
ISO 31000
ISO 10417:2004
ISO 10432:2004
ISO 13680
ISO 19011
ISO/IEC 31010
ISO 13628-4:2010
ISO 13703
ISO 10423:2009
ISO 14310:2008
ISO 13503-3:2005
ISO 11960
ISO 13628-1
ISO/TR 10400
ISO 15156-3:2009
ISO 10418


All current amendments available at time of purchase are included with the purchase of this document.

More BS standard pdf

BS 7981:2002

BS 7981:2002

Code of practice for the installation, maintenance, thorough examination and safe use of mast climbing work platforms (MCWPs)

$104.00 $208.28

BS 6160-3:1990

BS 6160-3:1990

Radio equipment used in mobile services-Methods of measurement for receivers for A3E or F3E emissions

$189.00 $378.46

BS BIP 2060:2004

BS BIP 2060:2004

Management of Risk. Guidance for practitioners

$22.00 $44.45

BS PD 6627:2001 ISSUE 3.1

BS PD 6627:2001 ISSUE 3.1

PNO-ISC Information document number 007. UK Interconnect use of SCCP & MTP

$175.00 $350.52