Your shopping cart is empty!
PDF Preview
BSI Group, 05/10/2021
Publisher: BS
File Format: PDF
$201.00$403.86
Published:10/05/2021
Pages:112
File Size:1 file , 17 MB
Note:This product is unavailable in Ukraine, Russia, Belarus
This document discusses: - economic aspects of ballast projection; - comparison of methods in France and Spain for rolling stock; - infrastructure assessment methods; - review of available literature; - next steps and recommendations regarding standardization and research.All current amendments available at time of purchase are included with the purchase of this document.
Industrial automation systems and integration. Integration of life-cycle data for process plants including oil and gas production facilities-Implementation methods for the integration of distributed systems: Template methodology
$215.00 $431.80
A method of temperature-rise verification of low-voltage switchgear and controlgear assemblies by calculation
$175.00 $350.52
Low-voltage electrical installations-Functional aspects. Operation of prosumer’s electrical installations
$125.00 $251.46
Intelligent transport systems. Data interfaces between centres for intelligent transport systems-Data interfaces between centres for Intelligent transport systems (ITS) using XML (Profile B)