BS PD CLC/TR 50600-99-1:2021

Information technology. Data centre facilities and infrastructures-Recommended practices for energy management

BSI Group, 08/31/2021

Publisher: BS

File Format: PDF

$175.00$350.52


Published:31/08/2021

Pages:56

File Size:1 file , 1.2 MB

Note:This product is unavailable in Ukraine, Russia, Belarus

This document is a compilation of recommended Practices for improving the energy management (i.e. reduction of energy consumption and/or increases in energy efficiency) of data centres.

NOTE It is historically aligned with the EU Code of Conduct for Data Centre Energy Efficiency (CoC) scheme operated by the Directorate-General Joint Research Centre (DG JRC) of the European Commission (EC), however contains additional practices.

It is recognized that the Practices included might not be universally applicable to all scales and business models of data centres or be undertaken by all parties involved in data centre operation, ownership or use.

All current amendments available at time of purchase are included with the purchase of this document.

More BS standard pdf

BS 07/30173966 DC

BS 07/30173966 DC

BS EN ISO 15750-2. Packaging. Steel drums. Part 2. Non-removable head (tight head) drums with a minimum total capacity of 212 l, 216,5 l and 230 l

$112.00 $225.82

BS 07/30173970 DC

BS 07/30173970 DC

BS EN ISO 15750-3. Packaging. Steel drums. Part 3. Inserted flange-type closure systems

$103.00 $207.69

BS 07/30169347 DC

BS 07/30169347 DC

BS EN 1938. Personal eye-protection. Goggles for motorcycle and moped users

$126.00 $253.65

BS 07/30173954 DC

BS 07/30173954 DC

BS EN ISO 20848-2. Packaging. Plastics drums. Part 2. Non-removable head (tight head) drums with a nominal capacity of 208,2 l and 220 l

$131.00 $263.20