BS PD IEC/TS 61724-2:2016

Photovoltaic system performance. Capacity evaluation method

BSI Group, 10/31/2016

Publisher: BS

File Format: PDF

$107.00$215.90


Published:31/10/2016

Pages:30

File Size:1 file , 730 KB

Note:This product is unavailable in Ukraine, Russia, Belarus

BS PD IEC/TS 61724-2:2016 defines a procedure for measuring and analyzing the power production of a specific photovoltaic system with the goal of evaluating the quality of the PV system performance. The test is intended to be applied during a relatively short time period (a few relatively sunny days).

In this procedure, actual photovoltaic system power produced is measured and compared to the power expected for the observed weather based on the design parameters of the system. The expected power under reference and measured conditions are typically derived from the design parameters that were used to derive the performance target for the plant as agreed to prior to the commencement of the test. For cases when a power model was not developed during the plant design, a simple model that increases transparency is presented in the annexes as a possible approach.

The intent of this document is to specify a framework procedure for comparing the measured power produced against the expected power from a PV system on relatively sunny days. This test procedure is intended for application to grid-connected photovoltaic systems that include at least one inverter and the associated hardware.

The performance of the system is quantified both during times when the inverters are maximum-power-point tracking and during times when the system power is limited by the output capability of the inverter or interconnection limit, reducing the system output relative to what it would have been with an inverter with generation freely following irradiance, if this condition is relevant.

This procedure can be applied to any PV system, including concentrator photovoltaic systems, using the irradiance (direct or global) that is relevant to the performance of the system.

This test procedure was designed and drafted with a primary goal of facilitating the documentation of a performance target, but it can also be used to verify a model, track performance (e.g., degradation) of a system over the course of multiple years, or to document system quality for any other purpose. The terminology has not been generalized to apply to all of these situations, but the intent is to create a methodology that can be used whenever the goal is to verify system performance at a specific reference condition chosen to be a frequently observed condition. A more complete evaluation of plant performance can be accomplished by using the complementary Technical Specification IEC TS 61724-3, Photovoltaic system performance - Part 3: Energy evaluation method.


Cross References:
IEC 61724-12
IEC/TS 61836
ISO/IEC Guide 98-1
IEC 60904-5
IEC/TS 61724-3
IEC 61829
IEC 61853-2
IEC 62446-1
ISO 5725
ASTM E2848-13


All current amendments available at time of purchase are included with the purchase of this document.

More BS standard pdf

BS PD CEN/TR 15745:2015

BS PD CEN/TR 15745:2015

Liquid petroleum products. Determination of hydrocarbon types and oxygenates via multidimensional gas chromatography method. Round Robin research report

$175.00 $350.52

BS PD ISO/TS 18790-1:2015

BS PD ISO/TS 18790-1:2015

Health informatics. Profiling framework and classification for Traditional Medicine informatics standards development-Traditional Chinese Medicine

$90.00 $180.34

BS PD CEN/TS 16794-1:2015

BS PD CEN/TS 16794-1:2015

Public transport. Communication between contactless readers and fare media-Implementation requirements for ISO/IEC 14443

$147.00 $294.64

BS PD CEN/TS 15989:2015

BS PD CEN/TS 15989:2015

Firefighting and rescue service vehicles and equipment. Graphical symbols for control elements and displays and for markings

$175.00 $350.52