BS PD IEC/TS 62872:2015

Industrial-process measurement, control and automation system interface between industrial facilities and the smart grid

BSI Group, 01/31/2016

Publisher: BS

File Format: PDF

$175.00$350.52


Published:31/01/2016

Pages:68

File Size:1 file , 2.2 MB

Note:This product is unavailable in Ukraine, Russia, Belarus

BS PD IEC/TS 62872:2015 defines the interface, in terms of information flow, between industrial facilities and the "smart grid". It identifies, profiles and extends where required, the standards needed to allow the exchange of the information needed to support the planning, management and control of electric energy flow between the industrial facility and the smart grid.

Industry is a major consumer of electric power and in many cases this consumption can be scheduled to assist in minimizing overall peak demands on the smart grid. In addition, many industrial facilities have in-house generation or storage resources which can also assist in smart grid load management. While some larger industrial facilities already manage their use and supply of electric power, more widespread deployment, especially by smaller facilities, will depend upon the availability of readily available standard automated interfaces.

Standards are already being developed for home and building automation interfaces to the smart grid; however the requirements of industry differ significantly and are addressed in this Technical Specification. For industry, the operation of energy resources within the facility will remain the responsibility of the facility operator. Incorrect operation of a resource could impact the safety of personnel, the facility, the environment or lead to production failure and equipment damage. In addition, larger facilities may have in-house production planning capabilities which might be co-ordinated with smart grid planning, to allow longer term energy planning.

Specifically excluded from the scope of this Technical Specification are the protocols needed for the direct control of energy resources within a facility where the control and ultimate liability for such direct control is delegated by the industrial facility to an external entity (e.g. distributed energy resource (DER) control by the electrical grid operator).


Cross References:
IEC 62264-1
IEC 62264-3
IEC TS 62443-1-1
IEC 62443-2-1
IEC TR 62443-3-1
IEC 62443-3-3
IEC 61508:2010
IEC 61511:2004
IEC 61968
IEC TS 61968-2:2011
IEC 61970-301:2013
IEC TR 62357-1:2012
IEC PAS 62746-10-1
IEC TR 62837:2013
ISO/IEC TR 10000-1:1998
ISO/IEC TR 15067-3
ISO 14040:2006
ISO/WD 17800


All current amendments available at time of purchase are included with the purchase of this document.

More BS standard pdf

BS 8418:2003

BS 8418:2003

Installation and remote monitoring of detector activated CCTV systems. Code of practice

$90.00 $180.34

BS 6037-1:2003

BS 6037-1:2003

Code of practice for the planning, design, installation and use of permanently installed access equipment-Suspended access equipment

$125.00 $251.46

BS 05/30115485 DC

BS 05/30115485 DC

EN 1739. Determination of shear strength for in-plane forces of joints between prefabricated components made of autoclaved aerated concrete or lightweight aggregate concrete with open structure

$120.00 $241.02

BS 05/30129368 DC

BS 05/30129368 DC

ISO 9170-2. Terminal units for medical gas pipeline systems. Part 2. Terminal units for anaesthetic gas scavenging systems

$138.00 $276.65