Your shopping cart is empty!
CSA Group, 08/01/2002
Publisher: CSA
File Format: PDF
$95.00$190.00
Published:01/08/2002
Pages:48
File Size:1 file , 530 KB
Note:This product is unavailable in Russia, Ukraine, Belarus
1. Scope
1.1 These provisions apply to the construction, materials, performance, and testing of NPS 1-1/4 in and smaller self-acting service-type regulators with internal relief valves or overpressure cut-off (OPCO)* devices, or both, utilized to control the pressure of gas delivered to a customer;s piping at a delivery pressure of 5 to 9 in water column (1.24 to 2.24 kPa), for installations designed for capacities up to 250 SCFH (7.1 m3/h). *Overpressure cut-off (OPCO) devices are also referred to as overpressure shut-off (OPSO) devices.
1.2 The yard-pound units provided are the standard. The SI (metric) equivalents in parentheses may be approximate values and are provided for information only, or for markings where both units of measurement are required.
Consists of N290.0-11, General requirements for safety systems of nuclear power plants and N290.2-11, Requirements for emergency core cooling systems of nuclear power plants
$395.00 $790.00
Gas-Fired Construction Heaters
$137.00 $274.88
Appliance Wiring Material Products
$142.00 $284.00
Performance requirements for automatic compensating valves for individual showers and tub/shower combinations, Includes Update No. 1 (2012), Update No. 2 (2013)
$68.00 $137.00