CSA ANSI/CSA HGV 4.5-2012

Priority and sequencing equipment for hydrogen vehicle fueling

CSA Group, 07/01/2012

Publisher: CSA

File Format: PDF

$115.00$231.40


Published:01/07/2012

Pages:27

Preface

This publication represents a standard for requirements for priority and sequencing equipment, which is part of a hydrogen gas vehicle fueling system.

Scope

1.1.1
These requirements apply to priority and sequencing equipment (see Part IV - Definitions) which is part of a hydrogen gas vehicle fueling system, hereinafter referred to as equipment.

1.1.2
Priority and sequencing equipment of a type not specifically addressed in these requirements may be subjected to such examinations and tests as deemed necessary by the testing agency to determine compliance with the intent of these requirements.

1.1.3
If a value for measurement, as given in these requirements, is followed by an equivalent value in other units, the first stated value is to be regarded as the specification.

More CSA standard pdf

CSA SPE-900-13

CSA SPE-900-13

Solar photovoltaic rooftop-installation best practices guideline

$38.00 $77.00

CSA C22.2 NO. 269.2-13

CSA C22.2 NO. 269.2-13

Surge protective devices - Type 2 - Permanently connected

$117.00 $234.00

CSA B45.1-13/A112.19.2-2013

CSA B45.1-13/A112.19.2-2013

Ceramic Plumbing Fixtures

$56.00 $113.00

CSA B45.2-13/ASME A112.19.1-2013

CSA B45.2-13/ASME A112.19.1-2013

Enamelled cast iron and enamelled steel plumbing fixtures

$41.00 $82.00