• CSA N287.6-94 (R2004)

CSA N287.6-94 (R2004)

Pre-Operational Proof and Leakage Rate Testing Requirements for Concrete Containment Structures for CANDU Nuclear Power Plants

CSA Group, 12/18/1999

Publisher: CSA

File Format: PDF

$345.00$690.00


Published:18/12/1999

Pages:15

File Size:1 file , 1.4 MB

Note:This product is unavailable in Russia, Ukraine, Belarus

1. Scope

1.1

This Standard provides the requirements for pre-operational proof tests and leakage rate tests of concrete containment structures of a containment system designed as Class Containment components. Note: Other components and appurtenances of the containment syst em may be tested coincident with the tests in this Standard, provided the intent of this Standard is observed and the requirements of CSA Standard CAN/CSA-N285.0 are considered.

More CSA standard pdf

CSA B602-16

CSA B602-16

Mechanical couplings for drain, waste, and vent pipe and sewer pipe

$103.00 $207.00

CSA 2.15:16 (R2021)

CSA 2.15:16 (R2021)

Gas-Fired Domestic Lighting Appliances

$154.00 $308.00

CSA S269.1-16 (R2021)

CSA S269.1-16 (R2021)

Falsework and Formwork

$42.00 $85.00

CSA C22.2 NO. 305:16 (R2020)

CSA C22.2 NO. 305:16 (R2020)

Cord reels and multi-outlet assemblies

$107.00 $215.00