• CSA N287.6-94 (R2004)

CSA N287.6-94 (R2004)

Pre-Operational Proof and Leakage Rate Testing Requirements for Concrete Containment Structures for CANDU Nuclear Power Plants

CSA Group, 12/18/1999

Publisher: CSA

File Format: PDF

$345.00$690.00


Published:18/12/1999

Pages:15

File Size:1 file , 1.4 MB

Note:This product is unavailable in Russia, Ukraine, Belarus

1. Scope

1.1

This Standard provides the requirements for pre-operational proof tests and leakage rate tests of concrete containment structures of a containment system designed as Class Containment components. Note: Other components and appurtenances of the containment syst em may be tested coincident with the tests in this Standard, provided the intent of this Standard is observed and the requirements of CSA Standard CAN/CSA-N285.0 are considered.

More CSA standard pdf

CSA Z364.5:22

CSA Z364.5:22

Safe installation and operation of hemodialysis and peritoneal dialysis in a home setting

$70.00 $140.00

CSA Z1615:22

CSA Z1615:22

First responder fatigue risk management system

$62.00 $125.00

CSA /ANSI Z23550:22

CSA /ANSI Z23550:22

Safety and control devices for gas and/or oil burners and appliances - General requirements

$124.00 $248.00

CSA R102:22

CSA R102:22

Data qualification for Canadian automated hydrometeorological monitoring stations

$50.00 $100.00