CSA N290.19:18

Risk-informed decision making for nuclear power plants

CSA Group, 12/01/2018

Publisher: CSA

File Format: PDF

$645.00$1,290.00


Published:01/12/2018

File Size:1 file , 1.6 MB

Note:This product is unavailable in Russia, Ukraine, Belarus

Introduction

0.1 General
Risk-informed decision making (RIDM) is a process that provides a formalized, rational, and systematic methodology for identifying, assessing, and communicating the various factors that support making a risk-informed decision. It helps ensure consistency from one decision to the next, helps ensure that important considerations are not overlooked, and provides a framework for the comprehensive documentation of the basis on which decisions are made.

0.2 Overview
The objective of this Standard is to provide a systematic approach to assist in decision making at nuclear power plants (NPPs) using a RIDM process.
This Standard describes the application of RIDM, the bases for risk-informed decisions, the key steps in the RIDM process, and management of the RIDM process.
This Standard is intended specifically to address matters of concern that have potential safety implications as well as those that have an adverse impact on operations of NPPs.

0.3 Users
This Standard is primarily intended for use by designers, operators, regulators, and individuals or organizations providing support to regulators and utilities.

More CSA standard pdf

CSA E598-1-98 Amendment 2

CSA E598-1-98 Amendment 2

Luminaires - Part 1: General Requirements and Tests - General Instruction No. 2

$107.00 $214.42

CSA E79-0-95 Amendment 2

CSA E79-0-95 Amendment 2

Electrical Apparatus for Explosive Gas Atmospheres - Part 0: General Requirements - General Instruction 2

$120.00 $240.50

CSA C22.2 NO. 239-95 Amendment 2

CSA C22.2 NO. 239-95 Amendment 2

General Instruction No. 3 - Heating and Cooling Equipment

$120.00 $240.38

CSA O86.1S1-98

CSA O86.1S1-98

Supplement No. 1 to O86.1-94, Engineering Design in Wood (Limit States Design)

$16.00 $32.00