Your shopping cart is empty!
CSA Group, 01/01/2002
Publisher: CSA
File Format: PDF
$34.00$68.00
Published:01/01/2002
Pages:78
File Size:1 file , 350 KB
Note:This product is unavailable in Russia, Ukraine, Belarus
Note: Appendix A provides a glossary of terms used in this Guide.
1.2 Structure of Guide: Investigate, Define, Plan, Check, Act Each clause in the Guide covers one of the above headings. For ease of use, the .plan. component of the implementation has been divided into three sections: .investigate., .define., and .plan.. By the end of this Guide, you will have covered all of the elements required by ISO 14001. Appendices and explanatory materials (set in text boxes) are intended to supply detailed information and add to the Guide.s usability. The worksheets included in Appendix B are intended to be used by agricultural owners and operators while developing their EMS. The worksheets should act as outlines for completing the various activities described in the Guide; they are not intended to provide comprehensive methodologies.
Instrument transformers - Part 9: Digital interface for instrument transformers (Adopted IEC 61869-9:2016, first edition, 2016-04, with Canadian deviations)
$172.00 $345.00
Junction boxes for photovoltaic modules - Safety requirements and tests (Adopted IEC 62790:2014, first edition, 2014-11, with Canadian deviations)
$180.00 $360.00
Instrument transformers - Part 6: Additional general requirements for low-power instrument transformers (Adopted IEC 61869-6:2016, first edition, 2016-04, with Canadian deviations)
$190.00 $380.00
Instrument transformers - Part 11: Additional requirements for low-power passive voltage transformers (Adopted IEC 61869-11:2017, first edition, 2017-12, with Canadian deviations)
$125.00 $250.00