Your shopping cart is empty!
CSA Group, 01/01/2004
Publisher: CSA
File Format: PDF
$130.00$260.87
Published:01/01/2004
Pages:38
File Size:1 file , 420 KB
Note:This product is unavailable in Russia, Belarus
1.2 This Guideline proposes that, at a minimum, consultation take place if a proposed development is within 200 m of the centreline of a pipeline (see Figure 1). This Guideline also urges that such consultation take place for development beyond 200 m of the centreline of a pipeline to the extent that a proposed development is still within a setback or emergency response planning zone associated with a given pipeline (e.g., some high-vapour-pressure or sour natural gas pipelines).
1.3 This Guideline provides information on the following subjects: (a) roles and responsibilities for key stakeholders (see Clause 4); (b) the pipeline industry (see Annex A); (c) products transported in pipelines (see Annex A); (d) land use planning issues with regard to pipelines (see Annex B);and (e) sources of additional information (See Annex C).
1.4 This Guideline is not intended to cover local natural gas distribution pipelines as defined in Annex A. Distribution pipelines are an integral part of local development, as are other utilities that support development. This kind of development already involves consultation among developers, local authorities, and local distribution (pipeline) companies.
1.5 Risk management is a framework that uses an integrated approach for assessing whether a risk is acceptable. It considers the risk and benefits of the development and facilitates the agreement of stakeholders on the acceptability of the risk involved. This Guideline is not intended to cover risk management concepts. These topics are covered in detail in some of the CSA and MIACC companion documents referred to in Annex D.
Anti-siphon fill valves for water closet tanks, Includes Update 1 (2017)
$37.00 $74.00
Performance requirements for water temperature limiting devices, Includes Update No. 1 (2017)
$35.00 $70.00
Swimming-Pool Luminaires, Submersible Luminaires and Accessories, Includes Update No. 1 (2016), Update No. 2 (2017), and Update No. 3 (2018)
$42.00 $85.00
Blood and blood components
$70.00 $140.00