• Guide to Preparing a Design Proposal for Paralleling Customer Generation with an Electric Utility

Guide to Preparing a Design Proposal for Paralleling Customer Generation with an Electric Utility

National Electrical Manufacturers Association, 01/01/1998

Publisher: NEMA

File Format: PDF

$49.00$98.00


Published:01/01/1998

Pages:78

File Size:1 file , 530 KB

Note:This product is unavailable in Ukraine, Russia, Belarus

Addresses facility electrical systems that must interface with an electric utility company grid in order to purchase power requirements.

More NEMA standard pdf

NEMA DC 3-2013

NEMA DC 3-2013

Residential Controls - Electrical Wall-Mounted Room Thermostats

$50.00 $100.00

NEMA MG 10-2013

NEMA MG 10-2013

Energy Management Guide for Selection and Use of Fixed Frequency Medium AC Squirrel-Cage Polyphase Induction Motors

$103.00 $207.72

NEMA LSD 68-2013

NEMA LSD 68-2013

Remote Phosphor Devices Used in LED Lamps, Engines and Luminaires

$145.00 $290.42

NEMA RV 3-2014

NEMA RV 3-2014

Application and Installation Guidelines for Flexible and Liquidtight Flexible Metal and Nonmetallic Conduits

$120.00 $241.69