• Guide to Preparing a Design Proposal for Paralleling Customer Generation with an Electric Utility

Guide to Preparing a Design Proposal for Paralleling Customer Generation with an Electric Utility

National Electrical Manufacturers Association, 01/01/1998

Publisher: NEMA

File Format: PDF

$49.00$98.00


Published:01/01/1998

Pages:78

File Size:1 file , 530 KB

Note:This product is unavailable in Ukraine, Russia, Belarus

Addresses facility electrical systems that must interface with an electric utility company grid in order to purchase power requirements.

More NEMA standard pdf

NEMA LSD 49-2010

NEMA LSD 49-2010

Solid State Lighting for Incandescent Replacement - Best Practices for Dimming

$38.00 $76.00

NEMA HP 8-2009

NEMA HP 8-2009

Electrical and Electronic Crosslinked, Modified Low Smoke Polyolefin (XLPO) Insulated Hook-Up Wire, Types LS (105 degrees C-600 V), ZHDM (90 degrees C-600 V), ZHDH (90 degrees C-600 V), ZH (125 degrees C-600 V), and ZHX (125 degrees C-1000 V)

$41.00 $82.00

NEMA PRP 2-2009

NEMA PRP 2-2009

Solvent-Cementing Joints for PVC Rigid Nonmetallic Conduit, Duct and Fittings

$111.00 $222.54

NEMA RV 4-2009

NEMA RV 4-2009

Application Guidelines for Service-Entrance Cable

$121.00 $242.52