Your shopping cart is empty!
PDF Preview
International Electrotechnical Commission, 12/01/2021
Publisher: IEC
File Format: PDF
$69.00$139.00
Published:01/12/2021
Pages:57
File Size:1 file , 1.2 MB
Note:This product is unavailable in Ukraine, Russia, Belarus
This document defines the procedure for carrying out withstand lightning and switching impulse tests and withstand superimposed impulse test on cables and their accessories.
This document applies solely to the methods of carrying out the tests as such, independently of the problem of selecting the test levels to be specified. The voltages pertaining to the system on which cables and accessories are to be used are given in IEC 60183 or in the relevant product standard.
This document specifies the following requirements:
- the characteristics and state of the test installation and those parts of the procedure which are common to withstand tests and tests above the withstand level;
- the procedure for carrying out withstand lightning and switching impulse tests and superimposed impulse test;
- the procedure for carrying out tests above the withstand level which is intended for research purposes.
High voltage direct current (HVDC) power transmission - Cables with extruded insulation and their accessories for rated voltages up to 320 kV for land applications - Test methods and requirements
$208.00 $417.00
High-voltage switchgear and controlgear - Part 4: Handling procedures for sulphur hexafluoride (SF6) and its mixtures
$196.00 $392.00
Photovoltaic concentrators (CPV) - Performance testing - Part 2: Energy measurement
$95.00 $190.00
Amendment 1 - Household and similar electrical appliances - Safety - Part 2-34: Particular requirements for motor-compressors
$44.00 $89.00