Your shopping cart is empty!
PDF Preview
International Electrotechnical Commission, 06/01/2019
Publisher: IEC
File Format: PDF
$256.00$512.00
Published:01/06/2019
Pages:388
Note:This product is unavailable in Ukraine, Russia, Belarus
The fieldbus Application Layer (FAL) provides user programs with a means to access the fieldbus communication environment. In this respect, the FAL can be viewed as a window between corresponding application programs. This part of IEC 61158 provides common elements for basic time-critical and non-time-critical messaging communications between application programs in an automation environment and material specific to Type 26 fieldbus. The term time-critical is used to represent the presence of a time-window, within which one or more specified actions are required to be completed with some defined level of certainty. Failure to complete specified actions within the time window risks failure of the applications requesting the actions, with attendant risk to equipment, plant and possibly human life.
Thermal-resistant aluminium alloy wire for overhead line conductor
$44.00 $89.00
Amendment 4 - Tungsten filament lamps for domestic and similar general lighting purposes - Performance requirements
$95.00 $190.00
Amendment 1 - Cables for portable earthing and short-circuiting equipment
$10.00 $20.00
Interpretation sheet 1 - Household and similar electrical appliances - Safety - Part 1: General requirements
$117.00 $234.81